You must be logged in to rate content!
2 minute(s) of a 189 minute read
10-21-2014
Starting to close out loose ends. Had to put in the console to finish the basic wiring. To put in the console had to put the trans cover on. To put the trans cover on had to install the insulation & carpet onto the sides of the tunnel.
Was told the FFR overflow tank is too small for the Coyote. Pulled it & put in a JEG'S unit (arrow) that was twice as big, should be the last I have to deal with on the cooling system, fingers crossed.
Also finished the air intake for the radiator. All the sheet metal surfaces will seal to the body. Hood hinges & hold open struts are installed. Broke a tap in a trunk lid hinge putting threads in for the lift struts. Have it in the freezer to see if I can shrink it some to drive it out.
Current target for a finished car is late November.
10-30-2014
Got some update shots from the body shop this morning.