You must be logged in to rate content!
3 minute(s) of a 464 minute read
7-5-2008
Well oil filter supply wasn't open, so maybe Monday for the oil inlet fitting.
Anyways, IC end tanks version 2.0 made. Just need to grind, port AND POLISH before welding them on to the IC. The oil catch tank is done.
Started adding fluids. I used the good shyte.
7/8/08
IC end tanks were ported and polished(internally), welded on IC core and found I needed to tweak a few things . TB elbow next.
Anybody want to ride shoot gun a mileage run to Medford Friday/Saturday? I may have access to an eddy current dyno Sunday to tune. So I need break in mileage.
7/9/08
Almost done with the TB elbow, just need to make triangular plates to fill the holes. Then porting and polishing of the insides and wrapping it with gold foil.
In anticipation of putting a 3 bar GM MAP sensor in place I built myself a little calibration tool. The gauge is huge, but it was the only one that had the accuracy I wanted and not cost $100+, the one I really wanted was $860.
Nice build!
Posted by Diggymart on 12/10/19 @ 12:54:14 PM