You must be logged in to rate content!
3 minute(s) of a 225 minute read
4-11-2013
Today's check list was pretty good!
Fuel system- DONE
Brakes- Done
Seats- installed
Exhaust- IP
Fuel systems:
wired up the negative lead from the battery neg post

Positive and negative, drilled a hole and threaded them through

Wired it up to the fuel pump, connected all the fuel lines, tightend it all down, and done!


Yeah fuel system done, CHECK!
Finally got the rear brake line, flared the hard lines, and wired it up, front and rear brakes are done!!!

Got the Recaro seats in, driverside bracket is done, drilled and bolted down!! SEATS DONE


Privacy hatch latches, since i keep having to get to the battery, i hat the privacy hatch string bolted down, and it was in the way and a pain, so I made some easy latches to take the privacy hatch on and off with ease.

all done

started working on the exhaust, to test fit and figure out how to avoid the steering linkage
cut pipe



it got late so i could grind anything smooth or i would piss off my neighbors, so the cuts dont look too great. but they will be fixed
Cut the reducer for the flange


Test fit

Still need to finish:
Digital Dash
Driveshaft
Exhaust

The never ending project ?
Posted by Diggymart on 12/21/21 @ 1:49:05 PM