Project AE86 aka the never ending project by marley4us

By diyauto
( 2 )

3 minute(s) of a 225 minute read

4-11-2013

Today's check list was pretty good!


Fuel system- DONE


Brakes- Done


Seats- installed


Exhaust- IP


Fuel systems:

wired up the negative lead from the battery neg post



Positive and negative, drilled a hole and threaded them through



Wired it up to the fuel pump, connected all the fuel lines, tightend it all down, and done!




Yeah fuel system done, CHECK!


Finally got the rear brake line, flared the hard lines, and wired it up, front and rear brakes are done!!!



Got the Recaro seats in, driverside bracket is done, drilled and bolted down!! SEATS DONE







Privacy hatch latches, since i keep having to get to the battery, i hat the privacy hatch string bolted down, and it was in the way and a pain, so I made some easy latches to take the privacy hatch on and off with ease.





all done



started working on the exhaust, to test fit and figure out how to avoid the steering linkage



cut pipe








it got late so i could grind anything smooth or i would piss off my neighbors, so the cuts dont look too great. but they will be fixed




Cut the reducer for the flange





Test fit




Still need to finish:


Digital Dash


Driveshaft


Exhaust



Comments

The never ending project ?

Posted by Diggymart on 12/21/21 @ 1:49:05 PM