SC400TT Project Car Stage II by SC400TT

By diyauto
( 4 )

2 minute(s) of a 718 minute read

1-27-2009

1-27-2009


Well gang, still making progress. Got back out there tonight, and continued on the fuel system. As my good friend Scott D says, "putting your fuel system together is kind of a little trial and error". The best laid out plans still will require some revisions due to lack of space, especially in these Lexus vehicles. Chaz and I got the rest of the fuel line installed up the firewall and connected to the back of the rails. Can't fit the Aeromotive in the front of the engine, too little space. So, it goes on the drivers side valve cover, right were it was before by Frank. Good job on that Frank. 

Some mock fitting showed that the passenger requires a 45 degree -6, and the drivers side gets a 90 degree. The hose is then routed to the Aeromotive. It is almost completed. Also secured the fuel filters to the bottom of the car. All looks good. I have posted a few pics for you to review.






All for tonight...



Comments