SC400TT Project Car Stage II by SC400TT

By diyauto
( 4 )

2 minute(s) of a 718 minute read

5-2-2009

Got some time to work on the car last yesterday. Got several things done:

  • Connected all the Catchcan lines and secured the catchcan

  • Relocated the Water/Meth pump from the drives side to the passenger's side

  • got the new SS braided hose made up from Amazon to connect the high pressure side of the power steering

  • Installed the new thermostat and water neck

  • made up the new SS braided lines for the transmission snd connected it up to the external cooler

  • Mounted the twin Zirgo fans

  • Mounted the radiator

  • Started working with the water tubing for the radiator, that will need some fabrication....

Much more to do this weekend....Almost there, but damn sometimes it seems to take forever....


Here are a few pics of some of the work and the Carbing radiator cooling plate that I bought and had polished.


Carbing Plate:


Greddy Catchcan mounted:


Twin Zirgo's mounted:


Tranny lines made and connected:


Relocated Water/Meth Pump:




Comments