SC400TT Project Car Stage II by SC400TT

By diyauto
( 4 )

3 minute(s) of a 718 minute read

2-29-2008

Here is the front, upper Water Bridge...It has been chromed, along with the two engine hoist hooks. I wasn't going to mod these, but they did not look well enough to fit with the rest of the engine, so I did. I also did this due to a change I am making to the front of the engine, and I will not be covering the bridge with the plastic covering that was there....Test fitted that anodized T Flare on top of it, and it looks very good... No ASS looking stuff now...


I should have the re-welded upper oil pan back tomorrow afternoon, along with the oil filter bracket, both polished and clear powder-coated....


Water bridge:



Assembling this motor, installing the tranny and the rest of the drive train, and sending this car to Tampa...


3-1-2008


I tapped the whole, and threaded the anodized pipe and T Flare into the top of the bridge. Unfortunately, the upper oil pan was not completed yesterday, so it will not be ready until Monday. I am working on the rear BBK tomorrow, and the Supra TT sway bars.I should have the engine back in the car next week sometime...I wheeled the motor out into the late afternoon sun to take a few pics...















Comments