1SC Stripper Build by Heyfred

By stevegolf
( 4 )

3 minute(s) of a 115 minute read

4-16-2021

Getting ready for Chrome Moly roll bar install. The car has only 13,000 miles and the the roof is gassing badly, (paint bubbling) due to the adhesive used to glue it on in 2002. To make it easier for the roll bar install, the original roof will be removed and a new carbon fibre roof from Midwest Chassis will be installed once roll bar is completed.


7-16-2021

Waiting on the Holley Terminator X Max. Scheduled to arrive at the end of June, now pushed out to the end of July.

Level 5 4L80e with Trans Brake, 2.10 gear set, upgraded pan and MadMan 4L80e Dipstick has arrived.

Working on the clearance for the 4L80e electrical connection. Used a 3” hole saw and piece of 3” exhaust tubing.

Used this picture for reference,

Main hoop mounts welded in. Tied in to the subframe connectors.


7-24-2021

Once once all fabrication is done, OEM Paint/Primer color used from the factory will be applied.