You must be logged in to rate content!
2 minute(s) of a 718 minute read
1-10-2008
Gang, I am tired...Just finished wrenching on the car, and it is past midnight. I am going to bed. Got a lot more done.
The baffle is installed, the lower oil pan is installed, the whole bottom end is sealed up and complete.
We also got the Timing belt installed, the lower intake, the loom is attached, the valve covers are installed, just about done with the top of the motor. Then the tranny and accessories get installed, turbos and plumbing get installed, and the car ships to Tampa...
Pics to come...Got a lot done last night and tonight...
1-12-2008
Here are a few more pics of the install:
Installed the Baffle:
Installed the lower oil pan:
Another:
Here are a few more pics of the install:
Installed the Baffle:
Installed the lower oil pan:
Another:
Installed the Black Powder coated Lower Intake:
Another:
More to come...