AFGMOTO1978 Build Thread by afgmoto1978

By diyauto
( 2 )

5 minute(s) of a 464 minute read

6-30-2007

LOL, well the umbilical cored is done and I need to route to the passenger compartment now.


Got some parts recently, two Synapse Engineering BOVs, these just became available in limited quantities. Awesome units by the way. Mostly complete fuel system setup, got the secondary rail and fuel reg from GZ and the rest at Oil Filter Services (they have everything!). Just need to get injectors. 














7-1-2007


Mostly done with the wiring in the passenger compartments. Still need to tie in the battery cables and finish the main distribution box mounting.









7/3/07


Interior wiring complete. Attached is a pic of a before/after refurbish body panels.











7-9-2007


Finally got all four corners of the suspension put together (had an issue with recieving a wrong half shaft assembly from MC) and put on the heat shield material for the exhaust. A bit overkill, but the passenger shouldn't have an issue of being slowly roasted.






7/15/07


Well I was hoping to have the motor in the engine bay by today, but in order of ease of setup and installation I need to wait for my injectors to come in and I need some fittings for the FPR. Then fabricate a mount for the FPR and the pressure vessel for the wastegate control. Easier to remove and install stuff with the motor out.


So mostly done with mod'n the engine harness, just need the injectors and injector clips. I went with 4 1000cc secondaries, two in series per side. And two new 550cc side feed units (main reason on holding off on installing the motor, major PITA to install those).








Comments

Nice build!

Posted by Diggymart on 12/10/19 @ 12:54:14 PM