You must be logged in to rate content!
5 minute(s) of a 115 minute read
6-11-2010
We are almost there.
- Had some issues with the housing and had them addressed and fixed.
- Third member setup, done.
- Had to fab up a torque arm cross member, done.
- New axles arrived.
- Custom 3.5" aluminum driveline built with 1350 U joints, done.
Next, build drive shaft loop, rear swaybar, pull trans out and have it built, get HP Tuners and get a tune.
I think I will be done.
6/11/2010
One more thing off the list.
Drive line loop, done.
7/3/2010
Been the waiting game. Parts came in for the rear swaybar and have been busy fabbing brackets for it. This weekend, I should be able to remove the rearend, finish up some welding and send it out for powdercoat next week.
Jacking stub for floor jack.
9/13/2010
Parts came back from powdercoat. I have been busy.
Coming soon, FLT level 6 trans.
The eagle has landed.